Home / Sectors & references

Sectors & references.

Since 2003, sedc has planned, managed and advised on around 680 projects – from a single laboratory room to a new building with a construction cost of around CHF 250 million. Every project has taught us something. Here is what we have learnt from them – and where we have proven it.

01 Experience

Laboratories that work from day one.

A laboratory is a machine made of space, furniture, media and air. We plan them together – from the fume cupboard and the gas supply to the ventilation that makes the fume cupboard safe in the first place.

  • Designing media, fume cupboards and ventilation as one system
  • Mastering containment and highly potent substances
  • Planning and qualifying laminar flow and cleanrooms
Roche Bau 91 – new ADC building

Client representation

Roche Bau 91 – new ADC building

F. Hoffmann-La Roche AG · Basel

around 250CHF m project
6Fit-outs under the framework mandate
HVAC & plumbing · LATrades
Task
A new research and laboratory building with laboratories for highly potent substances. For the critical trades, the client needed expert representation on its side.
Solution
Client representation for ventilation, chilled water, heating and the laboratories for highly potent substances; plus planning and qualification of the laminar flow units.
Result
After occupancy, six fit-outs followed under the framework mandate – trust that extends beyond the new building.

Client representationLaboratory, cleanroom & GMP

Also proven

Laboratory planning

New laboratory building G017

Dottikon ES AG · DottikonCHF 11 m

Analytics, quality control and kilo lab in one new building – from the layout through media specifications to supervision of construction.

Laboratory planning

Site Lab Sant Cugat

Roche Diagnostics · Barcelona (E)CHF 1.5 m

Laboratory layout with fume cupboards, cold room and plant room, ventilation concept and cost estimate for a diagnostics site in Spain.

02 Experience

Building while work goes on.

Research, hospitals and data centres do not stand still just because we are converting. We plan stages, temporary installations and switchovers so that operations barely notice.

  • Planning stages and switchovers in 24/7 operation
  • Temporary installations for media, ventilation and cooling
  • Coordination with users, security and facility management
Converted laboratory in a research building, Basel

Framework mandate, research campus Basel

220 laboratory conversions.
No interruption to operations.

Laboratory by laboratory, in 15 occupied research buildings, for a total construction cost of around CHF 129 million. Each dot is an assignment – research always carried on.

Laboratory, cleanroom & GMP Overall project management

Also proven

HVAC planning and site supervision

Data centre Kaiseraugst

F. Hoffmann-La Roche AG · Kaiseraugstongoing

Conversion of the server racks from air to water cooling with 500 kW – during ongoing 24/7 operation, with emergency cooling and waste heat recovery.

Operation, maintenance and renewal of building automation

Building automation, Delémont hospital

Hôpital du Jura · Delémontsince 2020

Supported 12 substations and 3 control centres with 24/7 on-call service, renewed the control system and planned the phased replacement of the controllers.

Planning and site management of conversion

Research building for five tenants WSJ-350

Novartis Pharma AG · Baselcompleted

A research building converted for up to five external tenants: shared BSL-2 laboratory, fire and gas detection system, network and plumbing – through to the integrated test to SIA 2046.

Building services for laboratory space

iCITY Reinach

Vebego AG · Reinach BLongoing

Laboratory space for several tenants in the occupied TechCenter: fume cupboards and ventilation, nitrogen, industrial waste water, electrical and fire protection.

03 Experience

On the client's side.

Anyone who builds needs someone who understands the technology and is committed only to them. We review, manage and take over – even when a project has stalled.

  • Reviewing plans and quotations independently
  • Leading planning teams, managing schedules and costs
  • Working through defects in a structured way and completing projects
Helvetia Park West

Project management and technical coordination

Helvetia Park West

Helvetia Insurance (formerly Baloise) · Basel

23.2CHF m
Hotel + officesduring ongoing operation
MEP · MTrades
Task
A high-rise with a hotel and offices was occupied after handover – and technically unfinished. Thousands of open items, while guests and staff were in the building.
Solution
Project management, building services technical coordination and MEP/BMS site supervision: defects recorded, prioritised and worked through trade by trade.
Result
Completion and technical refurbishment during ongoing hotel and office operation.

“The shared focus on professionalism, speed and structured handling has proven itself to this day.”

Thomas Grolimund, Basler Leben AG

Overall project management & technical coordinationExpertise & second opinion

Also proven

Client-side quality assurance

dsm-firmenich SPACE

dsm-firmenich AG · Sisselnongoing

Client-side quality assurance for building services, building automation and laboratory in a new building with laboratories, offices and staff restaurant (project around CHF 60 million).

Client representation

Packaging laboratory Bau 224 and laboratory space Bau 250

F. Hoffmann-La Roche AG · Kaiseraugstcompleted

Led the planning team, user meetings through to “approved for construction”, reviewed laboratory and media planning, managed schedules and costs – through to the building permit.

Client's building services lead

uptown Basel building 8

uptownBasel AG · Arlesheimaround CHF 69 m

An industrial building of 20 000 m² is becoming an innovation centre for medical additive manufacturing, with 12 000 m² of additional space. We led user requirements, cost estimate and planner selection on a fast track.

Second opinion and consulting

Value engineering for decarbonisation

Roche Diagnostics · Penzberg (D)Workshop

Two days of value engineering for the decarbonisation of a plant site, with our contribution on low temperature and waste heat recovery.

04 Experience

Less energy, less CO₂.

The biggest savings lie in existing systems: lower temperatures, recovered waste heat, properly controlled ventilation. We calculate them, plan them and implement them in operation.

  • Conversion to low temperature in existing buildings
  • Using waste heat from cooling and data centres
  • Measuring, visualising and comparing energy flows
Low temperature and heat recovery

Energy

Low temperature and heat recovery

F. Hoffmann-La Roche AG · Basel

up to 95 %less CO₂
7Research buildings
around 17CHF m
Task
Research and laboratory buildings on a campus were to be converted to a low-temperature network – without interrupting research operations.
Solution
Building-by-building conversion of heating, ventilation and air conditioning (buildings 65, 68–70, 92 and 93) and retrofitting of heat recovery on the ventilation systems of building 72.
Result
CO₂ reductions of up to 95 %.

EnergyOperation & sustainability

Also proven

Overall building services planning

Energy optimisation of two laboratory buildings

Novartis Pharma AG · BaselCHF 20 m

Energy-related renewal of two laboratory buildings with heating, ventilation, air conditioning, plumbing, electrical and I&C – together with laboratory planning and safety.

Building services analysis

CO₂ potential at the Penzberg plant

Roche Diagnostics · Penzberg (D)11 buildings

Building services of eleven production and office buildings examined for savings opportunities – as a basis for decarbonising the site.

Energy reporting

Energy dashboards for around 15 sites

Roche Diagnostics · worldwideannually

Every year, around 33 energy flow diagrams and dashboards for production and research sites from Rotkreuz to Suzhou.

Overall building services management

From boiler house to event hall

Novartis Pharma AG · BaselCHF 10.9 m

A boiler house from 1921 becomes an event hall; 250 kW of waste heat from the refrigeration plant of a neighbouring building provide heating via a heat pump.

Voices from our projects

Our clients tell their story.

Four clients, four projects – in their own words.

Interview with Dr. Joachim Bäckert

“The team rescued our construction project!”

Dr. Joachim Bäckertdsm-firmenich ag
Interview with Jens Neubert

“Competence and straightforwardness lead to success”

Jens Neubertdsm-firmenich ag
Interview with Marco Schmuck

“A business relationship became a genuine partnership”

Marco SchmuckMascon GmbH
Interview with Thomas Grolimund

“The right partner for complex challenges”

Thomas GrolimundBasler Leben AG

Playing a video loads it from YouTube (youtube-nocookie.com).

In their words

The team rescued our construction project!

On our large campus project, we faced considerable problems with the building services. sedc ag was recommended to us and proved to be an absolute stroke of luck. The team analysed the situation neutrally and competently, identified the problems and developed concrete remedial measures. We were particularly impressed by the experts’ ability to mediate in a complex field of tension between different stakeholder groups while maintaining their credibility on all sides. Thanks to this professional support, we were able to implement the necessary conversion measures successfully. The collaboration is excellent, and we plan to involve sedc ag in future projects right from the start. Highly recommended!

Dr. Joachim Bäckertdsm-firmenich ag

The right partner for complex challenges

On our Baloise Park project, we were facing thousands of defects – a challenge we could not have handled on our own. Following a tender, sedc ag was awarded the contract. The initial phase was complex, but the sedc team and we quickly found common ground. We shared the same ideas on how to work through the defects systematically. Our joint focus on professionalism, speed and structured processing has proven its worth to this day. The path we chose was absolutely right – the success of our collaboration proves it!

Thomas GrolimundBasler Leben AG

Competence and straightforwardness lead to success

We were looking for experts in performance testing and HVAC systems – sedc ag came highly recommended. Even in the first meetings, the team impressed us with its extensive experience in laboratory stress testing. The collaboration was very easy from the outset, as we were on the same wavelength. The openness, straightforwardness and unconditional determination of the team to drive projects forward successfully convinced us. The “single point of contact” approach has proven particularly effective – all trades are managed from a single source. That is what makes our collaboration so successful!

Jens Neubertdsm-firmenich ag

A business relationship became a genuine partnership

I got to know the sedc team on the challenging Baloise Park project. What impressed me from the very beginning was the team’s respectful manner, honesty and sincerity – even in interpersonally complex situations. Our collaboration has developed into a reliable partnership. We can count on each other both in business and on joint projects. The successful collaboration leads to mutual recommendations and further joint projects. I value working with sedc ag extraordinarily highly!

Marco SchmuckMascon GmbH

Companies worldwide rely on us

RocheNovartisdsm-firmenichBaloiseCiscoSandozUBSZürcher KantonalbankInselspital BernCBRELosinger MarazziCABBDottikonETAHôpital du JuraBurckhardtSwisscantonaturenergieIGD GrüterDM BauIBCellwar

Complete reference list

Over 680 projects since 2003.

We will gladly provide the complete reference list with projects, services and time periods on request.

Request the reference list